EARTHING ACCESSORIES

Earthing accessories let us enhance natural soil conditions, improve resistivity of poor conductive soils and backfill a drilled earth rod hole or trench. An earth rod pit is a necessary accessory to allow access for testing, maintenance and upgrades. If you require another style of earth rod pit or a pit with an earth bar installed inside, please contact us.

Products listed on our site are not exhaustive. If you can’t find your specific product requirement, please call 07 3734 7159, or email sales@ppindustries.com.au

Request quote

GROUND ENHANCEMENT MATERIAL - GEM Ground Enhancement

Part NumberPackagingComplies With
GEM25ABag with handlesIEC® 62561-7
GEM25ABKTPlastic bucket with locking lidIEC® 62561-7

Suggested Specifications

ParameterRecommended ValuesTest Method
Standards Compliance-Full compliance to IEC 62561-7 EPA Toxicity Characteristic Leaching Procedure (TCLP), test method 1311
Resistivity"<2 Ω-cm for powder <20 Ω-cm for mixed and cured material"Compressed powder according to ASTM G187-12 Mixed and cured per ASTM D991-89

QUICKFILL No-Mix Ground Enhancement

Part NumberPackagingComplies With
QF2511.3kg BagIEC® 62561-7

Suggested Specifications

ParameterValuesTest Method
Resistivity"<25 Ω-cm for powder <15 Ω-cm when mixed with 40% water by weight"4-Electrode Method as per ASTM G57-06
Density993kg/m3-

GROUND ROD INSPECTION PITS

Part NumberMaterialDimensions H x L xWRated Load
PIT03High Impact Polypropylene216 x 241 x 207 mm-
IH1250DPolyolefin305 x 305 x 305 mm6,804kg (10,206kg test load)
IH1250FPolyolefin584 x 305 x 305 mm6,804kg (10,206kg test load)
IH2600EPolyolefin457 x 305 x 305 mm6,804kg (10,206kg test load)

Tell us what you need

From specific product sourcing and advice to custom manufactured solutions, design support and turnkey service delivery, PPI is ready to assist. Complete the form and our team will be in touch.